Temporary Water for Phosphate Reduction in Lagoon Texas

Challenge – A provider of water parks in North Central Texas needed to cleanup water for filling a large recreational swimming lagoon after the supply well water was found to be contaminated with high levels of phosphate which would have caused large algae blooms without removal of phosphate.

Solution – Facing a tight deadline, customer trusted Expansa to treat brackish waters to reduce TDS including phosphate, and provide 300 gpm of single pass RO water direct to the lagoon.

Results   Expansa responded to the customer’s specific requirements and treated over 35Mgal of water without interruption allowing the operator to open the park five days ahead of schedule. 

Share:

Additional Case Studies

Containerized RO System for Gas Processing Plant in Texas

Challenge – A large Natural Gas Processing Plant in West Texas experienced multiple water treatment plant upsets due to aging equipment which resulted in the frequent procedure of hauling in RO water in order to keep the plant from going down. Solution – The plant turned to Expansa to treat the existing well water.  After a review

Read More

Long Term Water Processing Agreement for Gold Mine, Nevada

Challenge – A major gold mining operation in Nevada experienced multiple boiler tube failures due to inoperative controls systems on the existing water purification plant equipment. Solution – With no capex spending planed, plant trusted Expansa to treat variable well water and provide 500 gpm of single pass RO water for 600 PSI boiler feed

Read More