Search
Close this search box.
Search
Close this search box.

Long Term Water Processing Agreement for Gold Mine, Nevada

Challenge – A major gold mining operation in Nevada experienced multiple boiler tube failures due to inoperative controls systems on the existing water purification plant equipment.

Solution – With no capex spending planed, plant trusted Expansa to treat variable well water and provide 500 gpm of single pass RO water for 600 PSI boiler feed water makeup.  Customer executed a 24 month agreement with Expansa in order to plan accordingly for a new water treatment plant.

Results   Expansa responded to the customer’s specific and ever-changing requirements throughout the project, which prevented the facility from losing millions of dollars each day.  The plant has operated with 0 down days due to water treatment system upsets or failures for two years all with zero safety incidents.

Share:

Additional Case Studies

Containerized RO System for Gas Processing Plant in Texas

Challenge – A large Natural Gas Processing Plant in West Texas experienced multiple water treatment plant upsets due to aging equipment which resulted in the frequent procedure of hauling in RO water in order to keep the plant from going down. Solution – The plant turned to Expansa to treat the existing well water.  After a review

Read More

Containerized RO System for Gas Processing Plant in New Mexico

Challenge – A large Natural Gas Processing Plant in New Mexico experienced multiple water treatment plant upsets due to aging equipment which resulted in the frequent procedure of hauling in RO water in order to keep the plant from going down. Solution – The plant turned to Expansa to treat the existing well water.  After a

Read More