Challenge – A major oil field producer was required due to re-assessment intervals to hydrotest 125 miles of pipelines located in West Texas.  This particular section of pipeline was located on state land and the state required treatment of the hydrotest water to direct land application discharge standards which involved the reduction of Oil, Grease, Benzene, TSS, TDS and Chlorides.  During the testing, the hydro test water mixed with remaining produced water in the pipeline and the contaminates all became elevated including a TDS of 10,000 µS.  Caught of guard by the elevated contaminates the hydrotest came to a stop until a solution could be proposed. 

Solution – The operation was down for seven days before finally contacting Expansa. After reaching out to multiple vendors and none being able to respond rapidly the pipeline operator turned to Expansa to treat the water for discharge.  After a quick review of the requirements and existing infrastructure, Expansa mobilized equipment within 12 hours in order to get the operation restored.  The location was provided with bag filters, organo-clay, activated carbon, and one RO Trailer setup as Single Pass Reverse Osmosis to provide 300 gpm of water for discharge.  

Results   Expansa’s rapid response to the customer’s specific requirements throughout the project prevented the operator from losing millions of dollars each unplanned day the pipeline was out of service.  Expansa treated over 15Mgal that was used for irrigation versus disposal.

Share:

Additional Case Studies

Containerized RO System for Gas Processing Plant in Texas

Challenge – A large Natural Gas Processing Plant in West Texas experienced multiple water treatment plant upsets due to aging equipment which resulted in the frequent procedure of hauling in RO water in order to keep the plant from going down. Solution – The plant turned to Expansa to treat the existing well water.  After a review

Read More

Long Term Water Processing Agreement for Gold Mine, Nevada

Challenge – A major gold mining operation in Nevada experienced multiple boiler tube failures due to inoperative controls systems on the existing water purification plant equipment. Solution – With no capex spending planed, plant trusted Expansa to treat variable well water and provide 500 gpm of single pass RO water for 600 PSI boiler feed