Rapid Response For 550 MW CCGT Power Plant

Challenge – A 550 MW Power Plant in New Mexico experienced an RO system failure due to pump system failures.  Shutdown was not option due to the high power demand on the grid.

Solution – After exhausting multiple mobile demineralized trailers within 12 hours the plant turned to Expansa to treat the existing well water.  After a quick review of the plant requirements and existing infrastructure, Expansa mobilized several pieces of equipment with in 12 hours in order to the meet the customer’s specification.  The plant was provided with Booster Pumps, Double Pass Reverse Osmosis, Electro-Deionization (EDI), and DI Exchange Tanks to provide 125 gpm of 18 MΩ makeup water for a 1500 PSI HRSGs. 

Results   Expansa responded to the customer’s specific requirements throughout the project, which prevented the facility from losing millions of dollars each day.  While awaiting the installation of new pumps, the plant operated for two months with zero down days due to water treatment systems all with zero safety incidents.

Share:

Additional Case Studies

Containerized RO System for Gas Processing Plant in Texas

Challenge – A large Natural Gas Processing Plant in West Texas experienced multiple water treatment plant upsets due to aging equipment which resulted in the frequent procedure of hauling in RO water in order to keep the plant from going down. Solution – The plant turned to Expansa to treat the existing well water.  After a review

Read More

Long Term Water Processing Agreement for Gold Mine, Nevada

Challenge – A major gold mining operation in Nevada experienced multiple boiler tube failures due to inoperative controls systems on the existing water purification plant equipment. Solution – With no capex spending planed, plant trusted Expansa to treat variable well water and provide 500 gpm of single pass RO water for 600 PSI boiler feed

Read More